Read the specification, COA and factory documents together.
Different documents answer different questions. A productive review starts by connecting the product, batch and site instead of treating every document as interchangeable.

A specification describes the requirement
Read the named material, salt form and acceptance criteria first. Check whether the document describes the exact requested version and whether the units and reporting basis match the procurement brief.
A COA belongs to a particular batch
Match the product identity and lot number before reading results. Review each reported result alongside its method and criterion. Keep the date and document version so that a later delivery can be checked against the same record.
Additional reports need a clear scope
For supplementary testing, identify the sample, laboratory, method and report number. Ask which result answers your specific technical question. A report for another sample or an unrelated site should not stand in for the material being reviewed.
Factory certification has its own boundary
Review the certificate holder, named site, covered activity, standard and validity period together. Request the relevant facility documents and confirm their scope with our team.
Keep one list of unresolved questions
Use a short review list with three fields: the question, the document needed and the person responsible for follow-up. This makes a later revision easier to compare than a collection of disconnected screenshots.